# ./STARTUP confighostagent QAS

**** HOST detected as SAPQAS

**** The root directory to SUM is /usr/sap/QAS/SUM

**** Checking SID parameter[QAS] and parsed one: QAS

**** The SUM directory is under SID /usr/sap/$[SID:#required]/SUM

**** The saphostagent command would be /usr/sap/$[SID:#required]/SUM/sdt/exe/SLP

rotocol.sh

**** Set root:sapsys as owner of /usr/sap/hostctrl/exe/operations.d and /usr/sap

/hostctrl/exe/descriptors.d

**** Set root user and root group as owner of files in /usr/sap/hostctrl/exe/ope

rations.d and /usr/sap/hostctrl/exe/descriptors.d

**** Configuring SUM Abap:  /usr/sap/QAS/SUM/abap/SUMSTART confighostagent RESTA

RTSHA=no ****

**** SUM ABAP: https://SAPQAS:1129/lmsl/sumabap/QAS/doc/sluigui****

**** SUM benchmark tool: https://SAPQAS:1129/lmsl/migtool/QAS/doc/sluigui****

**** SUM Java: https://SAPQAS:1129/lmsl/sumjava/QAS/index.html****

**** SUM Dual stack: https://SAPQAS:1129/lmsl/sumjava/QAS/dual.html****

**** SUM Observer:https://SAPQAS:1129/lmsl/sumobserver/QAS/monitor/index.html*

***

**** Restarting SAP Host Agent ****

-> Start /usr/sap/hostctrl/exe/saphostexec pf=/usr/sap/hostctrl/exe/host_profile

<-

start hostcontrol using profile /usr/sap/hostctrl/exe/host_profile

**** SAP Host Agent has been restarted ****

**** You are using SAP Host Agent version: ****

**** hostagent release: 7.21 ****

**** hostagent patch number: 17 ****

**** Please check the central SUM note whether this SAP Host Agent version is su

fficient for SUM operation ****

#

 SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6

替换过期crlbag.p7s

 SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_02


开始解压文件到EPS/IN,约50G文件

 SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_03

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_04

 SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_05

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_06

 SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_07

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_08

 

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_09SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_10

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_11

DBATL720O10_42-20005243.SAR

解压brconnectSUM目录exe,错误消失

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_12

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_13

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_14

alter tablespace PSAPSR3 add datafile '/oracle/QAS/sapdata3/sr3_26/sr3.data26' size 1000M autoextend on next 20M maxsize 10000M, '/oracle/QAS/sapdata3/sr3_27/sr3.data27' size 1000M autoextend on next 20M maxsize 10000M'; 


 

 

警告:


Missing SAP Notes:

0001142128

0001158660

0001224011

0001247451

0001256384

0001263115

0001321756

0001354957

0001390993

0001399760

0001431044

0001462364

0001466928

0001488040

0001609895

0001614802

0001680583

0001719375

0001719977

0001861585

0002045835

0001714734

0001142128

0001488040

0002344014

0002222916

0002260116

0001160950

0001250481

0001279687

使用snote将以上note打进去 

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_15 

/DVD/HDB_CLIENT_AIX_PPC64

这里是输入HDBclient安装源文件,并不需要安装client,权限更改


 SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_16

Target System License /DVD/license/QAS.txt

原系统的永久key

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_17

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_18

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_19

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_20

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_21

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_22

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_23

保持当前版本,next返回上一步,不勾选add on

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_24

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_25

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_26

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_27

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_28

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_29

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_30

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_31

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_32

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_33

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_34

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_35


brspace -function tscreate -tablespace PSAPSR3731 -class none -data both -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tscreate -tablespace PSAPSR3731 -class none -data both -size 200 -incrsize 200 -maxsize 10000 -autoextend yes

 

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 14388 -autoextend yes

# brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 22077 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 917 -autoextend yes

# brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 9017 -autoextend yes

 

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_36

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_37

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_38

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_39

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_40

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_41


smq1清除队列lbwg删除队列

 SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_42

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_43

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_44

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_45

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_46

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_47

abap/heap_area_dia = 64000000000

abap/heap_area_nondia = 64000000000

ztta/roll_area = 300000000

ztta/roll_extension = 64000000000

abap/heap_area_total = 64000000000

 

参考link https://wiki.scn.sap.com/wiki/display/SL/Starting+and+stopping+the+shadow+instance+manually

手动重启影子实例

cd <update directory>/abap/bin

 ./SAPup stopshd    

./SAPup startshd     

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_48

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_49

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_50

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_51

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_52

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_53

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_54

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_55

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_56

accept


SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_57

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_58

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_59

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_60

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_61

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_62

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_63

 SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_64

目标系统时间比源系统慢了整整1个小时,调整后正常下一步

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_65

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_66

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_67

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_68

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_69

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_70

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_71

找到一个note,按照solution进行处理即可

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_72


SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_73

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_74

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_75

SAP ECC6.0迁移升级到EHP6 on HANA过程_迁移升级_76

SAP ECC6.0迁移升级到EHP6 on HANA过程_EHP6_77

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_78

SAP ECC6.0迁移升级到EHP6 on HANA过程_ECC_79

几个升级参考的几个link:

Optimizing DMO Performance https://blogs.sap.com/2015/12/15/optimizing-dmo-performance/

DMO: optimizing system downtime https://blogs.sap.com/2015/03/17/dmo-optimizing-system-downtime/

DMO with SUM – Tips and Tricks https://blogs.sap.com/2015/11/23/sum-with-dmo-tips-and-tricks/

Database Migration Option (DMO) of SUM – Introduction https://blogs.sap.com/2013/11/29/database-migration-option-dmo-of-sum-introduction/

DMO: downtime optimization by migrating app tables during uptime (preview)  https://blogs.sap.com/2014/09/08/dmo-downtime-optimization-by-migrating-app-tables-during-uptime-preview/